Weld Nipple, 1/4 Inch Gas x 9/16-18 Left Hand Thread, Torch Fitting
New/Like New
This Gas-Flo Weld Nipple is a precision-engineered torch fitting designed for reliable gas connections. Featuring a 1/4-inch gas connection and a 9/16-18 left-hand thread configuration, this female torch nipple ensures secure attachment and optimal flow control. The brass construction offers durability and resistance to corrosion, making it suitable for long-term use in welding applications. The left-hand thread design provides an additional safety measure, preventing accidental cross-connection with right-hand threaded fittings. This fitting is machined to exact specifications, ensuring a proper seal and maintaining consistent gas flow. Whether you're working on professional welding projects or maintaining your welding equipment, this torch nipple delivers the reliability and performance needed for quality results.
Price Analysis
Sign in to unlock bid recommendations
Get personalized bidding strategies, value scores, and max bid recommendations based on real market data.
Sign InCompetition Level
-

